MGTM 339 Final Exam Prep

18 flashcardsby Ethan
Study these flashcardsFree · spaced repetition · iPhone, Android, Mac & web

All cards

1
critical path
the path that takes the longest
2
Inventory
stock of materials
3
AON
activity on node
4
project
interrelated set of activities with definite start and end point
5
Project Management
a systemized, phased approach to defining, organizing, planning, monitoring, and controlling projects
6
The overall objective of a project has three basic targets:
scope, budget, time/deadline
7
WBS
Work breakdown structure
8
Network Diagram
a visual display, designed to depict the relationships between activities, that consists of nodes (circles) and arcs (arrows)
9
PERT
Program Evaluation and Review Technique
10
CPM
Critical Path Method
11
Path
the sequence of activities between a project's start and finish
12
Slack
excess time that each activity/node takes to complete their task
13
Project Crashing
shortening the duration of the project
14
Project Costs
direct, indirect, penalty
15
Lean
reducing excess waste
16
Lean Systems
operations systems that maximizes the value added by reducing waste
17
Takt time
rate of production required to meet demand
18
Just-in-time (JIT) Philosophy
the belief that waste can be eliminated by cutting unnecessary capacity or inventory and removing non-value-added activities in operations and processes