Product Process and Schedule Design

46 flashcardsby Kathleen
Study these flashcardsFree · spaced repetition · iPhone, Android, Mac & web

All cards

1
3. Specifies the end product in terms of dimensions, material composition, and packaging.
Product Designer
2
4.Determines how the product will be produced, including equipment needed and processes involved.
Process Planner
3
5. Specifies production quantities and schedules the production equipment.
Production Planner
4
6. 4 Product Design Factors
Influenced by aesthetics, function, materials, and manufacturing considerations.
5
7. Departments Influencing Product Design
Marketing, purchasing, industrial engineering, manufacturing engineering, product engineering, and quality control play a role in product design.
6
8. Show product parts in assembly but typically omit specifications and dimensions. Useful for layout and handling system design.
Exploded Assembly Drawings
7
9.Detailed drawings with part specifications and dimensions needed for fabrication.
Detailed Component Part Drawings
8
10. Involves planning the sequence of steps to manufacture a product efficiently, meeting cost and quality standards.
Process Design
9
11. Determines how the product is produced, makes the make-or-buy decision, identifies equipment required, and estimates operation time.
Process Designer
10
12. Deciding whether to make the product in-house or outsource it to an external supplier based on factors like cost and resources.
Make-or-Buy Decision
11
13. A detailed list of components required to manufacture the product, including part numbers and names.
Parts List
12
14. A document that lists parts and their hierarchy, quantities, and relationships to create the final product.
Bill of Materials (BOM)
13
15. A document listing operations, equipment, materials, setup times, and production rates for a product.
Route Sheet
14
16. Automates the planning of production operations. Two types: Variant CAPP (uses pre-existing plans) and Generative CAPP (creates new plans).
Computer-Aided Process Planning (CAPP)
15
17. Documents the order of component assembly into a finished product, useful in understanding product assembly.
Assembly Chart
16
18. Adds details about the production methods for each component, offering a full view of facility flow.
Operation Process Chart
17
19. A network-like chart showing the relationship and sequence between different operations, allowing flexibility in assembly.
Precedence Diagram
18
20. Answer key production questions: how much to produce and when, affecting machine choices, work shifts, space, and storage.
Schedule Design Decisions
19
21. Requires consistent equipment and space to handle stable output, e.g., 10,000 units per month.
Constant Production Facility Design
20
22. Requires less equipment and space for lower capacity, e.g., 1,000 units per month.
Low Production Facility Design
21
Example: A facility starting with 10,000 sets in the first month and increasing production by 10% each month needs to accommodate growth.
Facility Design: Must be flexible to expand capacity over time
Increasing Production
22

Long-Term Production: A facility producing 10,000 sets per month for 10 years needs a long-term, stable setup.
Short-Term Production: A facility producing 10,000 sets for just a few months, with uncertain future demands, needs a more adaptable design.
Long-Term vs. Short-Term Production:
23
23. Includes determining the quantity of parts, identifying machine needs, and calculating total machine requirements for production.
Process Requirements Phases
24
24. A continuous improvement model involving four steps: Plan, Do, Check, Act, for improving processes.
Plan-Do-Check-Act (PDCA) Cycle
25
25. Tools for improving planning and execution. They include affinity diagrams, interrelationship digraphs, tree diagrams, matrix diagrams, and more.
Seven Management and Planning Tools
26
26. Organizes verbal data into groupings, useful for brainstorming and idea generation.
Affinity Diagram
27
27. Maps logical links among related items to identify which items impact others the most.
Interrelationship Digraph
28
28. Maps actions needed to achieve a goal, breaking down complex objectives into manageable tasks.
Tree Diagram
29
29. Organizes information into sets for comparison, such as characteristics or functions.
Matrix Diagram
30
30. Maps conceivable events and contingencies during implementation, helping to prepare for unexpected issues.
Contingency Diagram
31
31. Develops a work schedule for facilities design, similar to CPM or Gantt charts.
Activity Network Diagram
32
32. Helps judge the relative importance of each criterion to focus resources on the most impactful areas.
Prioritization Matrix
33
Layout Characteristics
Material Handling Requirements
Unit Load Implied
Storage Strategies
Overall Building Impact
FACILITIES DESIGN ALTERNATIVES
34

distances travelled
shop floor visibility
aesthetics of the layout
ease of adding future business
Layout Characteristics
35
use of current material handling equipment
investment requirements on new equipment
space and people requirements
Material handling requirements
36
impact on WIP levels
space requirements
impact on material handling equipment
Unit load implied
37

space and people requirements
impact on material handling equipment
human factor risks
Storage Strategies
38
estimated cost of the alternative
opportunities for new business
Overall building impact
39


It is an essential early step in the process design.
Involves determining the scope of the facility.
Identifying Required Processes
40
Refers to the decision-making process on how products will be made after determining which products will be manufactured in-house.
Selecting the Required Processes
41
Steps involved in selecting the required processes include:
Step 1. Define elemental operations.
Step 2. Identify alternative processes for each operation.
Step 3. Analyze alternative processes.
Step 4. Standardize process.
Step 5. Evaluate alternative processes.
Step 6. Select processes.
42

Refers to the systematic arrangement of operations needed to assemble a product.
It involves documenting the assembly method using tools like assembly charts, operation process charts, and precedence diagrams to understand the flow of operations within a manufacturing facility.
Sequencing the Required Processes
43
How much to produce
lot size decision
44
When to produce
production scheduling
45
Three Phases of Specifying Process Requirements

First Phase: Determine Quantity
Goal: Figure out how many parts need to be produced, including extras for any defects.
Example: If you need 1,000 shoe soles, you might plan to make 1,050 to cover any that might be flawed.
Second Phase: Identify Machine Needs
Goal: Determine what machines are needed for each part of the production process.
Example: For making shoe soles, you might need a machine for cutting and another for molding.
Third Phase: Calculate Total Machine Requirements
Goal: Add up the machines needed for each part of the process to find the total number of machines required.
Three Phases of Specifying Process Requirements
46
Plan: Establish objectives and processes required to deliver results in accordance with the desired outcome. This stage involves goal setting and designing the steps needed to reach them.
Do: Implement the plan on a small scale, executing the process and gathering data for analysis.
Check: Monitor and evaluate the results against the expected goals, analyzing any deviations or areas of improvement.
Act: Based on the results from the "Check" phase, take corrective actions to improve or standardize the process, and then begin the cycle again for continuous improvement.
PDCA CYCLE- DR WILLIAM EDWARDS DEMING