1an analysis of space requirements
of the project based on organizational structure and functional set up pinpoints linkages and interaction of spaces
space management studies
2this is when the architect determines the adequate size and appropriate configuration and assemblage for a proposed project in consideration of the use allocation and interface of spaces
space planning
3this entails the conduct of primary and secondary researchers and assembled facts used as basis for conclusion
architectural research
4this is when the client calls upon the architect to give oral or written and direction to attend conferences to make evaluations and appraisals regarding a contemplated project and similas activities the architect renders valuable inputs whether or not the client pursues the projectthis The Architect in this area of practice engages in methods of producing building
components in a highly engineered, efficient and cost-effective manner, particularly
for residential and commercial applications.
consultation
5this services cover a broadline of architectural services ranging from initial problem identification to activities that would allow the architect to initially conceptualize an array of architectural and allied solutions
pre design
6in this selection process the architect explains is methodology in translating the plan/design requirements of the proposed project
interview
7in this method of selection, the competition may either be an idea competition design or design build competition. various architects or architectural firms submit plan design solutions to a particular design problem and are judged on the basis of comparative excellence
architectural design competition
8civic or
monumental projects.
architectural design competition
9shall refer solely to the National Government of the Republic of the
Philippines.
state
10the architecture act of 2004
ra 9266
11all natural
persons under Philippine law and jurisprudence with a valid certificate and a valid
professional identification card (representing the renewable license) for the lawful
practice of a State-regulated profession other than architecture.
professionals
12a natural
persons under Philippine law and jurisprudence with a valid certificate and a valid
professional identification card (representing the renewable license) for the lawful
practice of a State-regulated profession other than architecture.
architect
13iapoa means
integrated and accredited professional organization of architects
14method of selection is used when undertaking relatively small project
direct selection
15may be conducted by committees representing
institutions, corporations or public agencies.
Comparative Selection
16These preliminary studies involve the procurement, analysis and use of
secondary information gathered for the project to aid the Client in early
decision-making.
Pre-Feasibility Studies
17Detailed analysis of the project based on pre-feasibility studies will determine
the viability of a proposed development.
Feasibility Studies
18This phase involves the definition of the requirements of the project by the
Owner. The Architect in turn informs the Owner of the technical requirements
of the project and the concomitant professional fees.
Project Definition Phase
19evaluates the Owner’s program, schedule, budget, project site and
proposes methods of project deliveries.
Schematic Design Phase
20outline specifications to fix and illustrate the size and character of the
entire project as to type of materials, type of structural, electrical,
mechanical, sanitary, electronic and communications systems.
Design Development Phase
21prepares Technical Specifications describing type and quality of
materials, finish, manner of construction and the general conditions
under which the project is to be constructed.
Contract Document Phase
22The Architect in this area of practice engages in methods of producing building
components in a highly engineered, efficient and cost-effective manner, particularly
for residential and commercial applications.
BUILDING SYSTEMS DESIGN
23is defined as an act or process of estimating value.
Appraisal
24Monitor maintenance and upkeep services (cleanliness of corridors,
lobbies, stairs and other common areas, exits, parking areas,
garbage collection)
Building Maintenance.
25Supervise landscape contractors and gardeners for the proper
watering, pruning, trimming and maintenance of the landscape
(both hardscapes and softscapes);
Grounds and Landscaping Supervision.
26refers to the range of professional
services that covers Pre-design Services, Regular Design Services,
Specialized Architectural Services, Construction Services and Post-
Construction Services.
Comprehensive Architectural Services
27This cost-based method of compensation is applicable only to non-creative
work such as accounting, secretarial, research, data gathering, preparation of
reports and the like.
Multiple of Direct Personnel Expenses
28The person or organization who undertakes or promotes an ADC with
the primary objective of obtaining excellence in design for a project or for a
development concept.
Owner -
29The people appointed by the Owner to assess the entries to the
competition. The members of the Jury are called Jurors. It consists of a
majority of registered and licensed architects (RLAs, hereinafter referred to as
“Architect/s”) assisted by a lay Juror to represent and voice the intention of
the Owner.
Jury -
30An Architect nominated by the Owner and approved by
IAPoA to organize the ADC on behalf of the Owner.
Professional Advisor
31Specialist personnel who may be consulted by the
Jurors during the conduct of the ADC to permit them to obtain all necessary
relevant information.
Technical Advisors –
32with a single contract between the Architect and Owner, and sub-consultancy
contracts between the Architect and the other professionals working with the
Architect.
detailed architectural and engineering design services
33Buildings of the simplest utilization and character which shall include but not
be limited to the following:.
Group 1
34Buildings of exceptional character and complexity of plan / design
Group 3
35Buildings of moderate complexity of plan / design
Group 2