1longitude
also called meridian (noon) with arcs oriented north to south
2latitude
also called parallels with arcs oriented east to west
3Cartesian grid coordinate system
grid of latitude and longitude
4arc
a line segment that transverses a curved surface
5isotherm
equal to one line of temperature
6isobaths
a line of equal depth values
7isohytes
a line of equal precipitation
8isobars
lines of equal atmospheric pressure
10benchmarch
an elevation reference/datum usually placed by USGS
11chronometer
clock or timepiece
12sextant
measures latitude
13altitude
the height of an object or point in relation to sea level, ground level, or celesial body
16hour circles
conventional time zones
17what is the time zone used worldwide
Greenwich Mean Time (GMT)
18one degree
sixty minutes
19one minute of arcone ac
equal to sixty seconds of arc and also one nautical mile
20square minute
3,600 square seconds of arc
21one statute mile (s.m.)
5,280 feet
22one nautical mile (n.m.)
6,080 feet or 1.1515 s.m.
23one acre
43,560 sq. feet
24one square mile
640 acres
25what type of measurement is an acre foot
a volume value
26large scale maps
ratio range of 1:1-1:125,000
27small scale maps
ratios greater than 1:1,000,000
28medium scale maps
ratio range of 1:125,000-1:1,000,000
29azimuth
reference to the number of degrees about your horizon
30compass headings or coordinates
rely on the use of directional values (NSEW)
31degree headings
rely on an azimuthal direction of 0 to 360 (ex. NE v. 45 degree)
32map projections
provide spatial representation of the three-dimensional earth in two-dimensional map form
33polar projections
azimuthal
34equatorial locations
rely on a cylindrical projection
35mid-latitude locations
best portrayed by conical projections
36value of Equator and Prime Meridian
0 degrees latitude and longitude respectively
37value of arctic and antarctic circles
66.5 degrees north and south respectively
38value of tropic of cancer and capricorn
23.5 degrees north and south respectively
39rotation
the earth rotates every 24 hours
40revolution
the earth completes one revolution once a year
41vernal and autumnal equinoxes
equal days of light and darkness
42winter and summer solstices
longest and shortest night/day
43angle of inclination
earths tilt of 23.5 degrees is responsible for our seasons
44standard state zoning enabling act of 1926
provides police powers from state to local governments including health, safety, welfare, and general morals of the community
45standard city planning enabling act (SCPEA) of 1928/32
federal law which got city planning on a roll in the u.s. and provided local government with the authority to conduct town, city, and environmental planning
46planning process
1) be able to identify a research or planning problem 2) collect relevant data 3) develop specific plans and alternatives 4) implement plan or alternatives 5) evaluate and assess outcome
47zoning
land use, height, lot size, footprint, bulk, parking
48ordinances
deals with activities
49subdivision regulations
involves municipal services that support locak government such as drainage, electricity, sewage, fresh or potable water supplies, gas lines, etc.
50board of selectmen
usually three people
51mayoral form
a type of town or city administration
52strong mayor
voted by public
53weaker mayor
more ceremonial with no municipal authority, elected by town/city council
54third type of mayor
head of city council
55rights of land
rights associated with land;
1) developmentight to build
2) riparianight of adjacent access and use of water
3) groundwateright of access to groundwater
4) solaright to sunlight
5) airight to clean air where neighbors can't pollute you
6) ingress-regressight of lateral or interior access to property
7) transitight to put a road to access property
8) mineralight to minerals on or beneath your property
9) grazingight to graze your animals
10) agricultureight to farm your land
11) hunting-fishingight to fish or hunt on your land
56NEPA
National Environmental Policy Act of 1969, authored by Senator Henry Jackson and Senator Edmund Muskie
57CEQ
Council on Environmental Quality, includes the Guidelines or Procedural Provisions for Implementing NEPA
58steps of NEPA planning process
1) project is proposed 2) lead agency is identified/co-leads are approved by CEQ 3) task force and duty assignments are completed 4) site visit occurs if EIS is based upon infrastructure 5) environmental assessment or environmental impact assessment is undertaken 6) FONSI is issued (30 day cooling off or black box is engaged) 7) DEIS is written 8) 45-60 day C+R is granted 9) FEIS issued (30 day cooling off or black box is engaged) 10) if challenged for inadequacy an FEISS is undertaken only on those portions deemed inadequate
59teiring
building upon past experience
60scoping
identify key and critical issues early on
61two major classes of EIS
1) project-based (usually infrastructure or built environment) 2) programmatic (programs, plans, policies)
62EIS Alternatives
1) proposed action 2) no action alternative (NAA) 3) lesser scenario 4) greater scenario
63possible exemptions to NEPA
1) national defensive provisions 2) national interest provisions
64other forms of NEPA exemptions
1) CATEX 2) only use the USEPA claims functional equivalence to NEPA which means that USEPA does not have to comply with NEPA requirements because their day to day is same as NEPA
65major federal action
significantly affecting the quality of human environemnt
66basis of EIS involvement for private citizens
1) project requires federal funding 2) project requires federal permits 3) the magnitude of proposed project 4) proposed action will take place on federal lands
67SEPA
state environmental policy acts, more project oriented
68MEPO
municipal environmental protection ordinances
69EA or EIA
environmental impact assessment
70DEIS
draft environmental impact assessment
71FEIS
final environmental impact assessment
72FONSI
finding of no significant impact
73FOSI
finding of significant impact
74CATEX
categorical exclusions
76environmental audits
done to check a site to see if there is any contamination, financial institutions or banks and corporations aduits
77methods of cost analysis
1) cost-benefit 2) cost effectiveness 3) fiscal impact analysis (average costing v. marginal costing - thresholds)
78formative evaluations
implemented at beginning of a program, 1) program goals 2) program outcomes 3) benchmarks or baseline conditions/inventories
79summative evaluation
implemented at a mid or end-point in a programs existence
80what are the four major federal agency landholders
USFS, NPS, USFWS, BLM/Interior
81five federal agencies that manage U.S. land resources in NE
Department of Defense, USFWS, US Department of Agriculture's US Forest Service, BLM, NPS
82what are the six types of administrative remedies to make sure regulated public remains compliant
1) notice letters 2) consent decrees or agreements 3) modification or revocation of permits 4) administrative fines 5) injunctions 6) Moss Act - FOIA (Section 522)
83three public disclosure laws
1) FOIA 2) NEPA of 1969 and Endangered Species Act of 1953 3) ESA
84experimental design
use of pool not receiving intervention
85quasi-experimental design
program goals, outcomes, benchmarks or baselines, inventories
86hydrologic cycle
the continuous circulation of water in the Earth-Atmosphere system
87three outcomes that rain can have when hitting the earth
1) infiltration 2) runoff (overland flow) 3) evaporation
88how is plant interception of rain distinguished by
1) stem flow (flowing along bark on limbs and trunk of tree) 2) through fall (water dropping through leaf or foliage canopy of tree)
89what are the types of subsurface aquifers
1) confined aquifer, situated below an unconfined aquifer 2) unconfined aquifer
90what are the two zonal depths of unconfined aquifers
1) zone of aeration, airspace occupied by no water 2) zone of saturation, airspace is occupied by water
91what are zonal depths based on
1) porosity 2) permeability (interconnectivity and transmissivity of voids)
92water table
boundary between two zones
93what are the exposed water tables on slopes
1) seeps 2) springs
94artesian wells
brings groundwater to the surface without pumping because it is under pressure within an aquifer
95unconfined well
shallow surface well that penetrates the zone of saturation
96perched water tables
usually reside on top of a near impermeable feature known as a clay lens
97types of exposed water tables
brooks, kills, runs
98recharge
aquifers can be 'mined' where more water is used by man that is naturally reintroduced into the groundwate system
99where has there been an over pumping of coastal freshwater
long island
100saltwater intrusion
movement of saline water into freshwater aquifers
101artificial recharge
when men exceed the natural recharge process by gathering water via street drains and allowing it to naturally flow into the ground
102lost well
a well that has attracted a saltwater intrusion
103rates of stream or surface flows
1) base or normal flow 2) peak or flood flow
104how are we going to do on this exam?
great!! :-)