1Lean Manufacturing Concepts
Waste Elimination, Improving QCD, By Value Stream
2Measurement of the worth of Goods or services, by a customer based on it's usefulness in satisfying customer needs.
Value
3Activity, process, or operation that changes the product form one form to another in order to get it closer to the customer's specifications
Value
4Something that the customer is willing to pay for.
Value
5Represents unproductive resources
Waste
6Any activity that adds costs of time but does not add value
Waste
7Cosuming more resources than necessary to produce the goods, or services, that the customer wants
Waste
8Type of waste
Defects, Over-processing, Intellect, Over-production, Waiting, Motion, Transportation, Inventory
9DOWNTIME MEANS
Defects, Overproduction, Waiting, Non-standard/ Overprocessing, Transportation, Intellect, Motion, Excess Inventory
10Defective or scrap materials
Defects
11Cost of inspecting defects
Defects
12Responding to customers complaints
Defects
13Rework or re-inspection of questionable materials
Defects
14Operator Waiting for machines to run or cycle
Waiting
15Machine waiting for operator
Waiting
16Waiting fr parts, instructions approval, information, maintenance, decisions
Waiting
17Double or triple handling, moving in and out of storage areas and warehouses
Transportation
18Material can get damaged if it's moved too much
Transportation
19It adds no value and is often used to get the extra inventory out of the way
Transporation
20Employees are seen as source of labor only, not as true process experts
Intellect
21People are told what to do, and asked not to think
Intellect
22Emloyees are not involved in finding solutions, oppurtunities to improve our process are missed.
Intellect
23walking without working
Motion
24Searching for tools, materials or information.
Motion
25Reaching, bending or unnecessary motion due to poor house keeping or workplace layout
Motion
26Process is not designed with employees in mind
Motion
27Requires people, equipment and space to count, transport, store and maintain it.
Excess Inventory
28If we do not get orders the material wil become obsolete, and be thrown away
Excess Inventory
29Inventory is often used to hel hide other wastes
Excess Inventory
30Time spent doing something incorrectly, inspecting for errors, or fixing errors
Defects
31Doing more than what is needed by the customer or doing it sooner than needed
Overproduction
32Unnecessary movement of the "product" in a system
Transportation
33Waiting for the next event occurs or next work activity
Waiting
34Excess inventory, cost through financial costs, storage and movement costs, spoilage, wastage
Inventory
35Unnecessary movement by employees in the system
Motion
36Doing work hat is not valued by the customer or caused by definitions of quality that are not aligned with patient needs
Overprocessing
37Waste and loss fue to not engaging employees, listening to their ideas, or supporting their careers
Human potential
38A manufacturing philosophy to increase production efficiency by grouping a variety of parts having similarities of shape, dimension and /or process route
Group Technology
39A manufacturng philosopy that justifies batch production by capitalizing on design and manufacturing siilarities among component parts. In batch production, the products are made in small batches and large variety
Group technology
40Other term for Machine groups
Cells
41Used when the parts assigned to the group follow the same machine sequence
Sigle-row Layout
42Types of layout in the GT cell
Multi-row layout, semi-circular layout, loop layout
43Study of an operation or group of related operations for the purpose of analyzing their efficiency and effeciveness so that improvement can be developed
Operation Analysis
44Same basic objectives as methods engineering
Produtivity, time and cost, safety and quality
45Use of operation Analysis to methods analysts
- study all productive and non-productive elements of an operation , increas produtivity per unit of time, reduce unit costs while maintaining or improving quality
46The standardization of materials like other methods improvement techniques, is a. _________________.
Continous Process
47A form of business and manufacturing organization that links business together
Keiretsu
48Largest Vehicle Manufacturer in the word with annual sales of over 9 million vehicles
Toyota Motor Corporation
49Success Due to two techniques, JIT and TPS
Toyota Motor Corporation
50Continual problem solving is central to JIT
Toyota Motor Corporation
51Eliminating excess inventory makes problems immediately evident
Toyota Motor Corpration
52is a philosophy of continous and forced problem solving via a focus on throughput and reduced inventory
Just-In-Time
53emphasizes continous improvement, respect for people and standard work practicies
TPS
54supplies the customer with their exact wants when the customer wants it without waste.
Lean production
55the time it takes for goods to go through the on work step in the production process
Cycle time
56the time for goods to go through the whole process
Throughput time
57Powerful strategy for improving operations
Just-in-time
58Materials arrive where they are needed
Just-in-time
59Identifying problems and driving out waste reduces costs and variability and improves throughput
Just-in-time
60Requires a meaningful buyer-supplier relationship
Just-in-time
61Make all we can just in case
Push Strategy
62Makes the what's needed when we need it
Pull strategy
63Aligns production with customer demand
Takt time
64Center around specific work
Takt time
65Effective to determine over / under production
Takt Time
66Average production time for the final product
Cycle time
67Include actual production time
cycle time
68Effective to determine bottle neck
Cycle time
692 main pillarsof toyota production system
JIT, JIDOKA
70Automation with human touch
JIDOKA
71The bases of toyota production system
Heijunka, Kaizen
72produced according to what is needed, when it is needed and new much is needed
JIT
73a strategy to improve return on investment by reducing inventory and associated costs
JIT
74The process driven by Kanban Concept
JIT
75A scheduling sysem, for lean manufacturing and just-in-time manufacturing
Kanban
76Means sign or instruction card
Kanban
77Highlights the causes of problems because work stops immediately when a problem first occurs
JIDOKA
784 principles of JIDOKA
Detect the abnormality, stop production, Fix or correct the immediate condition, Investigate the root cause and install a countermeasure
79Helps organizations meet demand while reducing wastes in production and interpersonal processes
Heijunka
80Reducing the uneveness in a production process
Heijunka
81Minimizing the chance of overburden
Heijunka
82A long-term approach that systematically seeks to achieve smal incremental changes in processes in order to improve efficiency and quality
Kaizen
83Continous improvement
Kaizen
845S stands for
Seiri, seiton, seiso,seiketsu,shitsuke and sort, set in order, shine, standardize,sustain
85When in doubt, move it out - red tag technique
Sort
86A place for everything and everything in its place
Set in order
87Clean and inspect or inspect through cleaning
Shine
88Make up rules, follow and enforce them
Standardize
89Part of daily work and it becomes a habit
Sustain
90A study conducted by the Material Handling Institute revealed that between ________________ of bringing a product to market is associated with __________.
80 and 85 percent of the cost, material handling
91A technique for the analysis of man activity that uses motion-picture camera
Micromotion analysis
92Minimization of physical and intuitive workloads of the people involved in performing activity,
Motion Economy
93Guides the designer to create better equipment, fixtures, workplace, furniture, jigs, and other labor devices.
Motion Economy
94movements should be and can be done naturally
Principle of Natural movement
95simultaneous movement of body parts reduces fatigue and increases productivity
Principle of simultaneous movement
96Rythm referees to regular repetition of a movement or pattern
Principle of Rythmic movement
97Activities shoud be design to be encourage habituation
Principle of Habitual Movement
98Process should be standardzed and no unecessary activities or movements are added
Prnciple of Continous movement
99Are the principles that are expanded to different specialists in order to achieve motion economy.
Principle of Minimum movement, Principle of Natural Movement, Principle of Simultaneous movement, Principle of Rhythmic movement, Principle of Habitual Movement, Principle of Continoous Movement
100The 3 principle of motion economy
Use of Human Body, Arrangment of worklace, Design of tools and equipment
101Developed by Frank and Lillian Gilberth.
Therblings
102Key factors of simplifying work
Therbligs
103Directly advance progress of work. May be shortened but difficult to eliminate completely
Effective therbligs
104Motion of empty hand to or object; tie depends on distance moved; usually preceded by Release and followed by Grasp
Reach (RE)
105Movement of loaded hand; time depends on distance, weight, and type of move; ussuay preceeded by Grasp and followed by release or position.
Move (M)
106Closing fingers around an object; begins as the fingers contact the object and ends when control has been gained; depends on type of grasp; usually preceded by reach and followed by move
Grasp (G)
107Relinquishing control of object, typically the shortes of the therbligs
Release (RL)
108Positioning object in predetermined location for later use; usually occurs in conjunction with Move, as in orienting a pen for writing.
Preposition (PP)
109manipulating tool for intended use; easily detected, as it advances the progress work
Use (U)
110Bringing two mating parts together; usually preceded by position or Move; followd by Release
Assemble (A)
111Opposite of assembe, separating mating parts; usually preceded by Grasp and followed by Move or Replace
Disassemble (DA)
112Eyes or hands groping for object; begins as the eyes move in to locate an object
Search (S)
113Choosing one item from several; usually follows search
Select (SE)
114Orienting object during work, usually preceded by MOve and folowed by Release
Position (P)
115Comparing obect with standard, typically with sight, but could also be with the other senses
Inspect (I)
116Pausing to determine next action; usually detected as a hesitation preceding motion.
Plan (PL)
117Beyond the operator's control due to the nature of the opertaion, left hand waiting while right hand completes a longer reach
Unavoidable Delay (UD)
118Operator solely responsible for idle time, ege
Avoidable Delay (AD)
119Appears periodically, not every cycle, depends on the physical workload
Rest (R)
120One hand supports object while other does usefu work
Hold (H)