1Hydrographic survey planning
process of organizing the activities, equipment, personnel, logistics, and procedures needed to successfully conduct a hydrographic survey.
2preliminary information, operational plan, equipment, logistics, personnel, and risk evaluation
Six key planning factors
3Preliminary information
information gathered from the client, existing records, and preliminary field reconnaissance.
4Preliminary information
It provides the information needed to determine how the survey should be conducted.
5Client specifications
include the purpose of the survey, required accuracy, map or chart scale, scope and extent of the survey area, time limitations, and budget constraints.
6Existing information and reconnaissance
involve reviewing previous survey data, base maps, and related documents.
7Field reconnaissance
identifies existing control points, potential station locations, and traverse routes.
8Field reconnaissance
It also determines whether additional research or information is needed before the survey begins.
9Operational plan
covers all field and processing activities required for the survey.
10Nearshore surveys
may use small fishing vessels or Bathymetric LiDAR, if available.
11Offshore surveys
require larger vessels with sophisticated equipment.
12Coverage planning
includes determining traverse routes, securing local LGU permits, and establishing positional controls or tidal stations.
13traverse is run on one shore only
Long and narrow rivers with favorable shore conditions
14traverses are run on both sides and connected using suitable ties
Long and wide rivers greater than 1 km wide
15triangulation system is used
Rivers or lakes with unfavorable shorelines
16Baselines
measured at the start and end of the survey
1715 km to 20 km
the bases checked every
18Large lakes and ocean shorelines
use connected shore triangulation networks supplemented by coastal traverses tied to the primary triangulation system.
19Type or purpose of the survey
determines the required accuracy.
20Survey purposes
may include estimation, engineering, or national mapping and IHO-standard nautical charts.
21Short-term projects
have limited project durations and specific immediate objectives.
22Long-term projects
may involve continuing activities such as coastal monitoring.
23Available platform and instruments
determine the choice of survey method.
24Additional supporting activities
some hydrographic surveys require aerial photography, geodetic engineering work, and tidal observations.
25• Coordinate reference system (CRS)
• Local wrecks
• Climatology
• Water clarity
• Past survey data
• Tidal information
Additional information for extensive or high-accuracy surveys — may include:
26scope of the survey
equipment must be selected according to the
27Offshore or broad survey areas
may require sonar vessels or aircraft equipped for Bathymetric LiDAR.
28Nearshore areas
may use fishing boats, sounding poles, leadlines, or portable echosounders.
29Logistics
involves arranging the necessary transportation, food, and accommodation for the survey crew.
30Composition of survey personnel
depends on the type of survey and the technique being used.
31Cross-functional crew members
should be hired when possible to improve efficiency and allow personnel to perform complementary tasks.
32Local residents familiar with the area
recommended because they can provide useful local knowledge and assistance.
33Risk evaluation
determines the budget feasibility and project viability of the hydrographic survey.
34Equipment costs
may depend on whether equipment is rented or purchased.