1Horizontal position fixing
process of determining the horizontal position of a survey vessel or sounding point while depth measurements are being taken.
2Horizontal position fixing
ensures that every sounding is associated with its correct horizontal position.
3Parallel Line Method
uses a hand-held optical square and a float line to establish survey lines perpendicular to a straight beach baseline.
4Beach baseline
typically at least 100 m long and marked with ranging rods at both ends.
5Steel pegs
driven into the ground along the baseline
65 m spacing;
10 m spacing
• ___ — irregular terrain or rocky coastline.
• ___ — flat, long, straight beaches.
7Buoys
positioned offshore at right angles to each peg using an optical square or theodolite.
8Float line
anchored between each shore steel peg and its corresponding offshore buoy.
9Survey area
should ideally extend about 100 m on either side of the proposed shelter or landing area.
10Manual sounding
involves lowering a calibrated sounding chain at 5 m or 10 m intervals to create a grid of spot levels.
11Echosounder
automatically records soundings on a thermal paper roll, producing a continuous seabed profile.
12inbound runs toward the shore
Echosounder runs — ___ are preferred.
13calm sea conditions
surveys should be conducted in
1450 m from the float line
Run starting point — begins approximately ___ to improve boat alignment.
15200 m;
200 m;
12 mm;
5 m and 10 m intervals;
50 m;
polypropylene;
low elasticity
Parallel Line Method Specifications
• Maximum survey distance offshore: approximately ___.
• Maximum recommended float-line length: ___.
• Float-line rope diameter: ___.
• Coaxial colored float spacing: ___.
• Large red spherical floats: placed every ___ to make the line easier to identify and read.
• Preferred rope material: ___.
• Rope property: ___ is preferred because excessive stretching can affect survey-line accuracy.
16Single or Twin Theodolite Positioning
uses shore-based theodolites to determine the horizontal position of a survey vessel offshore.
17Ray Method
determines the vessel's position by observing its location along a known direction or ray from the shore.
18Ray Method
Maximum offshore distance: approximately 300 m.
19Triangulation Method
uses two shore-based transit/theodolite observers.
20Constant Range Tracking EPS
uses microwave-ranging Electronic Positioning Systems (EPS).
21Range-range positioning principle
the system determines position using measured distances from reference points.
22Constant Range Tracking EPS
developed as an alternative to the triangulation method.
23Constant Range Tracking EPS
has since been superseded by GPS-based positioning systems.
24Differential GPS (DGPS)
primary modern reference method for engineering and construction hydrographic surveys.
25Reference Station
stationary receiver located on a known benchmark.
26Remote Rover Station
receiver installed on the survey vessel.