Lesson 3.1 Reference Points

99 flashcardsby Dekano
Study these flashcardsFree · spaced repetition · iPhone, Android, Mac & web

All cards

1
A point appropriately marked on the ground with an established horizontal and vertical position determined by precise geodetic control survey methods
Reference Point
2
Monuments that serve as references for subsequent and subordinate surveys, including property surveys
Reference Points
3
Another term used for reference points
Control Points
4
The section of DAO 2007-29 that identifies the kinds of reference monuments
Section 34
5
The general category of reference monuments that includes geodetic control monuments, BLLM, BLBM, political boundary monuments, triangulation stations, primary cadastral stations, friar lands and old survey monuments, and prominent permanent structures
Reference Control Monuments
6
The reference control monument established through geodetic control survey methods
Geodetic Control Monument
7
The monument known as BLLM
Bureau of Lands Location Monument
8
The monument known as BLBM
Bureau of Lands Boundary Monument
9
The type of boundary monument used for provincial boundaries
Provincial Boundary Monument (PBM)
10
The type of boundary monument used for city boundaries
City Boundary Monument (CBM)
11
The type of boundary monument used for municipal boundaries
Municipal Boundary Monument (MBM)
12
The type of boundary monument used for barangay boundaries
Barangay Boundary Monument (BBM)
13
The four types of Political Boundary Monuments
Provincial Boundary Monument (PBM), City Boundary Monument (CBM), Municipal Boundary Monument (MBM), and Barangay Boundary Monument (BBM)
14
Stations established by Bureau of Lands/Land Management Services, BCGS/NAMRIA, United States Army Corps of Engineers, US Coast and Geodetic Survey, or other organizations whose work is of acknowledged standard
Triangulation Stations
15
The organization that may establish triangulation stations together with Lands Management Services
Bureau of Lands/Lands Management Services
16
The organization abbreviated as BCGS/NAMRIA that is listed among those that established triangulation stations
BCGS/NAMRIA
17
The organization whose triangulation work is included among acknowledged standard sources
United States Army Corps of Engineers
18
The organization formerly known as the US Coast and Geodetic Survey that is listed as an organization establishing triangulation stations
US Coast and Geodetic Survey
19
The reference monuments consisting of the primary stations of approved cadastral surveys
Primary Stations of Approved Cadastral Surveys
20
The reference monuments associated with lands previously surveyed under friar lands surveys and old surveys
Friar Lands Reference Monuments (Mon) and Old Survey Monuments (OSM)
21
Permanent structures of known position that may serve as reference control monuments, including church towers and historical monuments
Church Towers, Historical Monuments, and Other Prominent Permanent Structures
22
The general category of monuments used to mark the corners of lots
Lot Corner Monuments
23
The standard monument used for marking a lot corner
Standard Concrete Monument
24
A lot corner monument that may be used when it is part of a fence and has a diameter of at least 10 centimeters
Concrete Post
25
A lot corner monument made of metal with an outside diameter of at least 2 centimeters
Metal Pipe
26
A living edible fruit tree that may serve as a lot corner monument when it is at least 15 centimeters in diameter
Living Edible Fruit Tree
27
A tree belonging to the first group under Forestry Timber Classification that may serve as a lot corner monument when its diameter is 15–50 centimeters
Tree Belonging to the First Group
28
The minimum diameter required for a living edible fruit tree to qualify as a lot corner monument
15 centimeters
29
The allowable diameter range for trees belonging to the first group under Forestry Timber Classification when used as lot corner monuments
15–50 centimeters
30
A portion of a masonry or concrete wall that may serve as a lot corner monument
Point of Masonry or Concrete Wall
31
A fixed natural object with an exposed surface of more than one meter in diameter that may serve as a lot corner monument
Immovable or Fixed Hard Rock or Boulder
32
The minimum exposed surface diameter required for a hard rock or boulder to serve as a lot corner monument
More than 1 meter
33
A lot corner marker made of wood or steel that is resistant to destruction by fire, natural corrosion, or decay
Peg
34
The minimum cross-section required for an acceptable wood or steel peg near the top
50 millimeters square
35
The minimum length required for an acceptable wood or steel peg
400 millimeters
36
The minimum length from the top over which the peg must have at least 50 millimeters square cross-section
100 millimeters from the top
37
The two broad categories of reference monuments discussed in the lesson before the specific monument illustrations
Reference Control Monuments and Lot Corner Monuments
38
The control monument category illustrated with Geodetic Control Monuments and Project Control Monuments
Control Monuments
39
The monument category illustrated with municipal and barangay boundary monuments
Political Boundary Monument
40
The monument illustrated as a standard monument for marking lot corners
Standard Lot Corner Monument
41
The monument category specifically associated with mineral land surveys
Mineral Land Survey Monuments
42
The monument category specifically associated with forest boundaries
Forest Boundary Monuments
43
The specific mineral-land monument representing the principal corners of mineral land
Principal Mineral Land Corners
44
The other type of corner monument used in mineral land surveys
Other Corners of Mineral Land
45
The forest boundary monument representing the major permanent boundary marker
Permanent Major Boundary Monument
46
The forest boundary monument used as an intermediate permanent boundary marker
Permanent Intermediate Boundary Monument
47
The forest boundary marking used before permanent forest boundary monuments are established
Preliminary Forest Boundary Marking
48
The DENR issuance section stating that reference points, political boundaries, and other tracts of land shall be defined and marked on the ground by concrete monuments
Section 33 of DAO 2007-29
49
The type of monuments specified in the Manual of Procedure for defining and marking reference points, political boundaries, and other tracts of land
Concrete Monuments
50
The corners that must be monumented when lots run along physiographic or natural features
The First and Last Corner of the Lot
51
A prominent turn based on this feature shall be considered a corner
Highest Tide Line
52
The office responsible for establishing at least one pair of standard location monuments in each city and municipality
LMB/LMS
53
The designation given to the first standard location monument established in each city and municipality
BLLM No. 1
54
The designation given to the second standard location monument established in each city and municipality
BLLM No. 2
55
The minimum number of standard location monuments that LMB/LMS shall establish in each city and municipality
One pair
56
Additional location monuments are established whenever necessary so that no lot shall be more than this distance from a reference point
1 kilometer
57
The process of establishing additional reference monuments to provide closer reference points for surveys
Densification
58
The network whose establishment and densification shall continue in accordance with EO 45 s. 1993, DAO 1994-22, DAO 2005-13, and other pertinent issuances
National Geodetic Network
59
The executive issuance cited in the lesson concerning the establishment and densification of the national geodetic network
EO 45 s. 1993
60
The DAO cited together with EO 45 s. 1993 concerning the national geodetic network
DAO 1994-22
61
The DAO cited concerning the continued establishment and densification of the national geodetic network
DAO 2005-13
62
The database containing Geographic and Plane Coordinates of land survey reference monuments belonging to Third Order and below
National Database of Geographic and Plane Coordinates (GPC) of all Land Survey Reference Monuments
63
The agency responsible for managing the National Database of GPC of land survey reference monuments belonging to Third Order and below
Land Management Bureau (LMB)
64
The office that receives copies of the National Database of GPC from the LMB
Concerned Land Management Services (LMS)
65
The office that must furnish data on newly established reference points to the LMB for updating the National Database
Land Management Services (LMS)
66
The agencies and offices that have online access to the National Database for data sharing and efficient servicing of the public
DENR, LMB, NAMRIA, and the LMS Regional Office
67
The order of control included in the National Database of GPC of all Land Survey Reference Monuments described in the lesson
Third Order and Below
68
The coordinates contained in the National Database of land survey reference monuments
Geographic and Plane Coordinates (GPC)
69
The office responsible for updating the National Database using information on newly established reference points
Land Management Bureau (LMB)
70
The agency that receives copies of the National Database from the LMB
Concerned Land Management Services (LMS)
71
The system that allows DENR, LMB, NAMRIA, and the LMS regional office to share reference monument data
Online Access to the National Database
72
The monument marking a control point using a non-corrosive metal such as brass rods or copper nails embedded at the center of a triangle
Control Point Mark
73
The symbols and information placed on a reference monument to identify its control point, order, establishing office, location, or project
Monument Markings
74
In the illustrated geodetic control monument, the abbreviation representing the provincial code
CGY
75
In the illustrated geodetic control monument, the number identifying the control point
3000
76
In the illustrated geodetic control monument, the number representing the year the monument was established
2005
77
In the illustrated geodetic control monument, the triangle symbol identifies the
Control Point Mark
78
The non-corrosive metals specifically mentioned for the control point mark embedded at the center of the triangle
Brass Rods or Copper Nails
79
In the illustrated geodetic control monument, the label identifying the accuracy order of the monument
2nd Order
80
In the illustrated geodetic control monument, the abbreviation identifying the office or entity that established the reference point
LMS
81
In the illustrated project control monument, SN FDO, BKN represents the
Name of the Municipality and the Province
82
In the illustrated project control monument, BLLM No. 3 represents the
Bureau of Lands Location Monument Number
83
In the illustrated project control monument, CAD 542-D represents the
Cadastral Project Number
84
In the illustrated project control monument, BL represents the
Office or Entity that Funded the Project
85
In the illustrated project control monument, 1979 represents the
Year the Monument was Established
86
The cadastral survey number shown on the illustrated political boundary monument
CAD-553-D
87
The document cited as providing the monument dimensions and markings illustrations
DMC-2010-13
88
The circular or triangular mark on a monument that identifies the control point and may contain brass rods or copper nails
Control Point Mark
89
A point appropriately marked on the ground whose horizontal and vertical positions are established through precise geodetic control methods and which is used as a reference for property surveys
Reference Point
90
A reference monument category containing Geodetic Control Monuments, BLLMs, BLBMs, political boundary monuments, triangulation stations, primary cadastral stations, friar lands and old survey monuments, and permanent structures
Reference Control Monuments
91
A reference monument category containing standard concrete monuments, concrete fence posts, metal pipes, qualifying trees, walls, rocksoulders, and pegs
Lot Corner Monuments
92
A qualifying tree used as a lot corner monument must be a living edible fruit tree of at least this diameter
15 centimeters
93
A metal pipe used as a lot corner monument must have an outside diameter of at least
2 centimeters
94
A concrete fence post used as a lot corner monument must have a diameter of at least
10 centimeters
95
A hard rock or boulder used as a lot corner monument must have an exposed surface of
More than 1 meter in diameter
96
A wood or steel peg used as a lot corner monument must be resistant to
Fire, natural corrosion, or decay
97
The minimum cross-sectional dimension specified for a qualifying peg
50 millimeters square
98
The minimum length specified for a qualifying peg
400 millimeters
99
The minimum distance allowed between a lot and its nearest reference point when additional location monuments are established
1 kilometer
Study all 99 cards for free