Hydrographic Surveying Lesson 3.1-3.3

138 flashcardsby Dekano
Study these flashcardsFree · spaced repetition · iPhone, Android, Mac & web

All cards

1
The method of locating soundings using a range line established along the shore and an angle observed from shore
Range Line and an Angle from Shore
2
The method that uses range lines and is applicable to small water bodies where range signals can easily be established and seen
Intersecting Range Lines
3
The method suitable for shorelines having many bends where observations must be made regularly or at different times
Intersecting Range Lines
4
The two factors considered when adopting the intersecting range-lines method
Shape and Size of the Body of Water; Shore Topography
5
The lines located on the shore and the range lines that are laid out to intersect at approximately right angles
Baselines and Range Lines
6
The signals used to mark each range line in the intersecting range-lines method
Range Signals
7
The location where the boat proceeds before taking soundings in the intersecting range-lines method
Intersection of Two Range Lines
8
The factor that defines the precision of the survey in the intersecting range-lines method
Distance Between Range Lines
9
The method used to determine whether the bottom of a river is filling or scouring
Intersecting Range Lines
10
The method used to determine the volume of material removed during dredging operations
Intersecting Range Lines
11
The method used in setting up cofferdams for bridge piers or other underwater structures
Intersecting Range Lines
12
The method similar to stadia surveying in which one angle and a stadia distance are observed from shore
One Angle and Stadia Distance from Shore
13
The location where the instrument is set up in the one-angle-and-stadia method
Shore near the Water Level
14
The rod carried by the sounding team in the one-angle-and-stadia method
Stadia Rod
15
The type of boat used by the sounding team in the one-angle-and-stadia method
Heavy Flat-Bottom Boat
16
The distance from the instrument to the sounding location in the one-angle-and-stadia method
d
17
The formula used to compute the distance from the instrument to the sounding location
d = Ks + C
18
The quantity obtained by subtracting the bottom intercept from the top intercept
Stadia Interval
19
The multiplicative constant in the stadia distance formula
K
20
The additive constant in the stadia distance formula
C
21
The usual value of the multiplicative constant in the stadia method
100
22
The usual value of the additive constant in the stadia method
0
23
The observation made by the instrument man together with the stadia interval when a sounding is taken
Bearing or Azimuth
24
The instrument component that may also be used as a sounding rod in shallow areas
Stadia Rod
25
The method convenient for surveying small bodies of water when the water current is not rough
One Angle and Stadia Distance from Shore
26
The main advantages of the one-angle-and-stadia method
Ease and Rapidity of Plotting Observed Soundings
27
The method that uses a graduated wire or cross rope stretched across a narrow stream
Cross Rope Method
28
Another name for the Cross Rope Method
Tag-Line Method
29
The calibrated wire rope stretched perpendicular from hubs on a baseline to the survey boat
Cross Rope
30
The locations along the cross-sections where soundings are marked on the tape
Sounding Points
31
The instrument used from the boat to obtain soundings in the cross-rope method
Sounding Chain or Rod
32
The additional rope used to attach the boat when surveying a swift-running stream
Second Rope
33
The usual sounding interval for a narrow river using the cross-rope method
1 to 3 m
34
The method suitable for surveying detailed cross-sections of rivers and channels
Cross Rope Method
35
The method applied in determining stream discharge
Cross Rope Method
36
The method applied in dredging operations using cross-sections
Cross Rope Method
37
The method also known as the Norwegian Method
Direction and Vertical Angle
38
The method in which vertical depression angles are observed from higher ground to the boat
Direction and Vertical Angle
39
The type of angle observed in the Norwegian method
Vertical Depression Angle
40
The type of leveling used to obtain the height of the instrument above water
Ordinary Differential Leveling
41
The quantity obtained by trigonometric computation when an EDM is not available in the Norwegian method
Horizontal Distance
42
The location suited for setting up the instrument in the Norwegian method
Cliff or High Bluff
43
The method applicable when the river is too vast for chaining across
Direction and Vertical Angle
44
The method that locates soundings by observing an offshore vessel simultaneously from two shore stations
Two Angles from Shore
45
The surveying principle applied by the Two Angles from Shore method
Intersection Method
46
The condition in which the sounding stations are not in a definite line
Two Angles from Shore
47
The method best suited when it is challenging to establish range signals on the shore
Two Angles from Shore
48
The ideal condition when the intersecting lines in the Two Angles from Shore method are nearly at right angles
Two Angles from Shore
49
The angle range within which the observed lines should intersect for a reasonable degree of accuracy
30° to 150°
50
The first step in solving the intersection problem
Solve for the Unknown Angle
51
The geometric property used to solve the unknown angle in an intersection problem
Sum of Angles of a Triangle
52
The sum of the three interior angles of a triangle
180°
53
The step involving the coordinates of the two given points to determine the baseline length
Compute the Length of the Baseline
54
The law used to determine the lengths of the other sides
Sine Law
55
The line whose azimuth is first computed from the coordinates of the given points
Line BC
56
The quantity determined from the coordinates of two points to establish the direction of a line
Azimuth
57
The step in which the azimuths of the other lines are determined from the interior angles
Compute the Azimuths of the Other Lines
58
The step in which the coordinates of the unknown point are obtained using a known endpoint, distance, and azimuth
Determine the Coordinates
59
The calculation using the other side to verify the coordinates of the unknown point
Check
60
The method that is an application of the resection problem
Two Angles from Boat
61
The method in which the position of the instrument is determined by measuring horizontal angles between three known points
Two Angles from Boat
62
The instrument usually used in the Two Angles from Boat method
Sextant
63
The three points whose positions are already known in the resection method
Known Points
64
The point whose position is being determined in the resection method
Unknown Point
65
The method in which the sounding vessel position is determined from three known points
Three-Point Fix
66
The circle that can be described through any three given points
Circumference of a Circle
67
The geometric principle stating that the angle between two fixed points measured at a third point is the same for points on the same part of the circumference
Three-Point Fix
68
The second circle defined when a second angle is measured from the same unknown point
Second Circle
69
The point defined by the intersection of two circles
Unknown Point
70
The factor on which the strength of a three-point fix depends
Angle of Intersection
71
The angle that the intersection should nearly approach for a stronger three-point fix
90°
72
The condition in which the observer is inside the triangle formed by the three objects
Strong Fix
73
The configuration in which the three objects form an equilateral triangle and the observer is at the center
Strongest Fix
74
The condition in which the three objects are close to the observer and form an equilateral triangle
Strongest Fix
75
The condition in which the sum of the two observed angles is equal to or greater than 180° and neither angle is less than 30°
Strong Fix
76
The condition in which the two angles are as nearly equal as possible
Strong Fix
77
The approximate minimum sum of the two angles for a satisfactory fix
50°
78
The condition in which the three objects are in a straight line, or the center object lies between the observer and the line joining the other two
Strong Fix
79
The condition in which the center object is nearest to the observer
Strong Fix
80
The condition in which the two circles approach tangency
Weak Fix
81
The condition in which the position cannot be satisfactorily determined because of the geometric relationship
Indeterminate Fix
82
The condition expressed by Angle BAC + Angle BOA + Angle COA = 180°
Indeterminate Fix
83
The quantity defined as the sum of x and y in Case 1 of three-point resection
R
84
The equation for R in Case 1 of three-point resection
R = x + y = 360° − (ψ + λ + ω)
85
The equation used to compute y in Case 1
cot y = cot R + [(b sin ψ) / (a sin λ sin R)]
86
The equation used to compute x after solving for y
x = R − y
87
The distance solved using b, y, and λ in Case 1
AP
88
The angle solved to determine the direction of AP
CAP or BAP
89
The lines whose lengths and directions are solved after determining AP
PC and PB
90
The final computational step after determining the necessary distances and directions in the three-point fix
Compute the Coordinates of Point P
91
The final verification performed after computing the coordinates of P
Check
92
The process of determining the horizontal position of a sounding with respect to established horizontal control
Position-Fixing
93
The framework that provides the reference for the horizontal location of soundings
Horizontal Control
94
The framework that provides the reference level for water-level and depth measurements
Vertical Control
95
The control that answers the question “Where is the sounding?”
Horizontal Control
96
The control that answers the question “Relative to what level?”
Vertical Control
97
The control that relates the shoreline, hazards, vessel tracks, and depths
Horizontal Control
98
The control that connects water-level observations to benchmarks
Vertical Control
99
The reference elevation used for water-level measurements
Water Level Datum
100
The standard elevation defined by a particular tide phase and used as a reference for local water levels
Tidal Datum
101
The fixed points to which tidal datums are referenced so they can be recovered
Benchmarks
102
The datum used as a basis for surveying works
Tidal Datum
103
The highest tide that can be predicted to occur
Highest Astronomical Tide (HAT)
104
The highest astronomical tide whose actual water level may be exceeded because of meteorological conditions
Highest Astronomical Tide (HAT)
105
The mean of the higher high-water height observed during each tidal day over the National Tidal Datum Epoch
Mean Higher High Water (MHHW)
106
The average of all daily tidal high-water heights observed over the National Tidal Datum Epoch
Mean High Water (MHW)
107
The datum defined as the average height of the sea for all stages of the tide
Mean Sea Level (MSL)
108
The datum increasingly used as the base for general leveling operations
Mean Sea Level (MSL)
109
The datum defined as the mean of all low waters observed over long periods
Mean Low Water (MLW)
110
The datum used as a reference for depth measurement
Mean Low Water (MLW)
111
The common chart datum that is the average of the lower of two low waters over long periods
Mean Lower Low Water (MLLW)
112
The datum usually employed when a great deal of tidal range results from marked diurnal inequality
Mean Lower Low Water (MLLW)
113
The lowest tide that can be predicted to occur
Lowest Astronomical Tide (LAT)
114
The tidal datum that is sometimes used as a chart datum
Lowest Astronomical Tide (LAT)
115
The tide that may fall lower than its predicted LAT because of meteorological conditions
Lowest Astronomical Tide (LAT)
116
The arithmetic mean of MHHW and MLLW
Diurnal Tide Level (DTL)
117
The arithmetic mean of MHW and MLW
Mean Tide Level (MTL)
118
The height difference between MHHW and MLLW
Great Diurnal Range (GT)
119
The height difference between MHW and MLW
Mean Range of Tide (MN)
120
One-half the average difference between the two high waters of each tidal day
Mean Diurnal High Water Inequality (DHQ)
121
The value obtained by subtracting MHW from MHHW
Mean Diurnal High Water Inequality (DHQ)
122
One-half the average difference between the two low waters of each tidal day
Mean Diurnal Low Water Inequality (DLQ)
123
The value obtained by subtracting MLLW from MLW
Mean Diurnal Low Water Inequality (DLQ)
124
The average interval in hours between the moon's transit over the Greenwich meridian and the following high water at a location
Greenwich High Water Interval (HWI)
125
The average interval in hours between the moon's transit over the Greenwich meridian and the following low water at a location
Greenwich Low Water Interval (LWI)
126
The maximum height reached by a rising tide due to periodic tidal forces and other meteorological, hydrologic, or oceanographic conditions
Highest Observed Tide (Max Tide)
127
The minimum height reached by a falling tide due to periodic tidal forces and other meteorological, hydrologic, or oceanographic conditions
Lowest Observed Tide (Min Tide)
128
The fixed base elevation established at a tide station and used as the reference for all water-level measurements
Station Datum
129
The datum referenced to a primary benchmark at the station and held constant regardless of changes to the water-level gauge or tide staff
Station Datum
130
The official time segment over which tide observations are taken and reduced to obtain mean tidal values
National Tidal Datum Epoch
131
The length of the National Tidal Datum Epoch
19 years
132
The process of connecting a tidal benchmark to the national reference system
Tidal and Geodetic Connection
133
The traditional method of connecting a tidal benchmark to nearby geodetic benchmarks with known geodetic elevations
Differential Leveling
134
The satellite-based method of determining the geodetic elevation of a tidal benchmark
Static GPS
135
The number of known benchmarks preferably used to verify the tidal-geodetic connection
Three Known Benchmarks
136
The points with known coordinates recommended for verifying the tidal-geodetic connection
Known Benchmarks
137
The reason for connecting to more than one benchmark
To Verify the Connection and Determine Unstable Benchmarks
138
The process that allows water-level datums and geodetic datums to be related to each other
Geodetic Survey at Tide Gauges
Study all 138 cards for free