Hydrographic Surveying Lesson 1.3

37 flashcardsby Dekano
Study these flashcardsFree · spaced repetition · iPhone, Android, Mac & web

All cards

1
Seven operations turn a survey requirement into a usable map
Reconnaissance, Planning &
preparation, Horizontal control, Vertical control, Topographic
survey, Hydrographic
survey, Map preparation
2
Reconnaissance steps
Reference marks, Water-level station, Access & routes, Hazards & conditions, Existing information, Feasibility
3
Find existing monuments and possible new control locations.
1 Reference marks
4
Identify a stable, accessible and representative gauge site.
Water-level station
5
Check launch points, traverse routes, navigation constraints,
and permits.
Access & route
6
Note obstructions, traffic, currents, exposure,
communications, and security
Hazards & condition
7
Review prior surveys, charts, base maps, imagery, and local
knowledge
Existing information
8
Confirm that the intended method, vessel, schedule, and
coverage are realisti
Feasibility
9
6 Planning Questions
Purpose, Extent, Method, Resources, Schedule, Risk
10
What will the client decide, and what accuracy or
standard applies?
PURPOSE
11
Where are the limits, depth range, access points,
and priority areas?
EXTENT
12
How will positions, depths, water levels, shoreline,
and features be measured?
METHOD
13
Which vessel, sensors, software, personnel,
permits, and support work are needed?
RESOURCES
14
What tides, weather, traffic, daylight, and
mobilization constraints control timing
SCHEDULE
15
What can cause unsafe work, data failure, delay, or
cost overrun—and what is the fallback?
RISK
16
Answers: Where is the sounding?
HORIZONTAL CONTROL
17
Answers: Relative to what level?
VERTICAL CONTROL
18
Field acquisition combines the _____
visible shoreline and unseen
bottom
19
Map the adjacent land-water
interface
TOPOGRAPHIC SURVEY
20
Measure the bottom and submerged
features
HYDROGRAPHIC SURVEY
21
Quality depends on both the
accuracy and density of observations
22
Before and during the acquisition process
PLATFORM, POSITIONING, DEPTH SENSOR, ANCILLARY SENSORS, CHECKS, BACKUPS
23
Seaworthy vessel or suitable craft; stable
mounting; safe working space
PLATFORM
24
GNSS or other method configured to the
required reference system.
POSITIONING
25
Sounding pole, lead line, single-beam,
multibeam, lidar, or suitable technique.
DEPTH SENSOR
26
Water level, sound speed, motion,
heading, draft, and time synchronization
as required.
ANCILLARY SENSORS
27
Offsets, calibration, comparison
measurements, crosslines, coverage, and
daily review.
CHECKS
28
Spare power, storage, cables, field
records, alternate instruments, and
recovery plan
BACKUPS
29
Data Processing
INGEST, CORRECT, CLEAN, VERIFY, BUILD, ARCHIVE
30
Preserve raw data, logs, calibration records, and metadata.
INGEST
31
Apply position, water level, draft, sound speed, motion,
timing, and datum corrections as applicable.
CORRECT
32
Review outliers and artifacts without deleting valid shoals or
significant features
CLEAN
33
Examine coverage, overlaps, crosslines, uncertainty, feature
detection, and consistency.
VERIFY
34
Create soundings, surfaces, contours, charts, profiles,
volumes, and reports appropriate to purpose
BUILD
35
Package source data, processed results, metadata, quality
evidence, and limitations.
ARCHIVE
36
Daily review prevents small field problems from becoming
survey gaps
CHECK, TEST, ACQUIRE, REVIEW, DECIDE
37
Hydrographic surveying workflow
PLAN, CONTROL, MEASURE, VERIFY, DELIVER
Study all 37 cards for free