1(Building Permits)
What needs to be provided to the zoning and planning dept? (4 points)
-Floor plans
-Site Plans
-Copies of the deed
-Neighborhood CCR's
(covenants, codes, restrictions)
2(Building Permits)
Building with tires
-A Civil engineering permit allows you to build with tires.
-The site is considered a temporary dump.
-Tires are considered garbage
-The Permit comes through the Environment Dept.
3(Building Permits)
Site Plan (4 points)
-This is a drawing of the land, and shows where the property line is.
-It shows where the septic tank is.
-It shows if there is a water source on the property and which way it flows.
-It show which way is North.
4(Building Permits)
Zoning clearance needed (7 points)
-Environment Dept.
-State Dept.
-Public Works
-Utility Company
-Neighborhood Associations
-Solid Waste Dept.
-Water and Sanitation
5(Building Permits)
Environmental Dept.
Makes sure you are not contaminating the environment (Liquid Waste Permit)
6(Building Permits)
State Dept. (Engineer)
Deals with access to water
7(Building Permits)
Public Works
Deals with access of emergency vehicles to your property (fire trucks, police etc.)
8(Building Permits)
Neighborhood Ass.
They govern particular rules and codes for a particular neighborhood.
9(Building Permits)
Utility Company
They supply electricity, they will need to be notified that you will not be on the grid.
10(Building Permits)
Solid Waste Dept.
They deal with where you dump your garbage. You have to register with them so they are aware of your building.
11(Building Permits)
Process for building Permit
You will need an information sheet from the Assessor's Office. It comes from the township. This document contains legal information about the land.
They will need construction drawings: Foundation Plan, Floor Plan, Roof and Framing Plan, Elevation and Details.
Information on the Architect , Contractor and Engineer will also be required.