1What are isolated surveys?
Surveys of isolated land parcels used for agricultural, residential, commercial, resettlement, or other purposes.
2What is the maximum area covered by isolated surveys?
Not more than 1,500 hectares.
3What regulation defines isolated surveys?
Section 6, DAO 2007-29.
4What are the seven classifications of isolated surveys?
Group Settlement/Townsite, Public Land, Amendment, Private Land, Government Land, Conversion, and Other Land Surveys.
5What is a Group Settlement Survey (GSS)?
Subdivision of A and D lands of not more than 1,500 hectares into 50 parcels or more.
6What is a Townsite Subdivision Survey (TS)?
Subdivision of A and D lands into 50 parcels or more, covering not more than 1,500 hectares.
7What is a Public Land Survey?
Original survey of A and D lands not subjected to private rights or devoted to public use.
8What is an Amendment Survey?
A survey that changes the number of lots of untitled or undecreed properties without changing the original boundary technical description.
9What is a Private Land Survey?
Survey of land claimed or owned by individuals, partnerships, corporations, or other organizations.
10What is a Government Land Survey?
Survey of parcels administered by or belonging to the National Government or its branches and instrumentalities.
11What are the three classifications of Government Land Surveys?
Friar Land Estates, National Government Lands, and Local Government Units (LGU) Lands.
12What is a Friar Land Estates Survey?
Survey of lands purchased by the government from religious orders and private corporations from 1904 to 1913.
13What law governs Friar Land Estates?
Act 1120, also known as the Friar Lands Act.
14What was the purpose of purchasing Friar Lands?
Distribution to actual occupants and bona fide settlers.
15What is a National Government Lands Survey?
Survey of government-owned patrimonial properties not intended for public use.
16What is an LGU Lands Survey?
Survey of lands acquired by provincial, city, municipal, or barangay governments.
17What law governs LGU land acquisition?
Republic Act 7160, or the Local Government Code of 1991.
18What is a Conversion Survey?
Survey transforming approved graphical cadastral surveys, Cadm, and PCadm into numerical or regular cadastral lots.
19What does Cadm stand for?
Cadastral Mapping.
20What does PCadm stand for?
Photocadastral Mapping.
21What is an Other Land Survey?
Survey determining the metes and bounds of parcels not covered by other classifications for a specific purpose.
22What are the two methods for determining lot boundary positions in GSS and TS?
GNSS observations and ETS observations.
23When is GNSS observation used for boundary positioning?
When the area is at least 1,500 hectares.
24When is ETS observation used for boundary positioning?
When the area is below 1,500 hectares.
25What reference system is used for ETS traverse observations?
Established PRS92 reference points.
26Can a Geodetic Engineer use GNSS for areas below 1,500 hectares?
Yes, at the engineer's discretion.
27How are lot corners determined in GSS and TS?
By side shots using conventional surveying instruments.
28What instrument is required for lots of at least 1,500 hectares?
Electronic Total Station (ETS).
29What instrument is required for lots of 500 to 1,500 hectares?
One-second optical or electronic theodolite with EDM.
30What instrument is required for lots of 10 to 500 hectares?
Six-second optical or electronic theodolite with EDM.
31What instrument is required for lots of 5 to 10 hectares?
Twenty-second engineer's transit and 100-meter steel tape.
32What instrument is required for lots below 5 hectares?
Thirty-second engineer's transit and 50-meter steel tape.
33Can higher-precision instruments be used?
Yes, instruments with higher precision and longer range may be used.
34What must be done to surveying instruments before use?
Testing, calibration, and registration.
35What coordinate system governs GSS and TS projects?
PRS92.
36What accuracy requirement applies to GSS and TS projects?
Project Control Survey accuracy requirements.
37When may Geodetic Engineers conduct GSS or TS surveys?
Upon receipt of survey authority from concerned DENR officials.
38What regulation specifies the granting of survey authority?
Sections 16 and 19 of DAO 2007-29.
39What regulation applies to lands under another government agency's jurisdiction?
Section 17 of DAO 2007-29.
40When may a Public Land Survey be conducted?
Upon issuance of survey authority or survey order from the concerned DENR official.
41What regulation governs surveys of reclaimed lands?
Section 130 of DMC 2010-13.
42Can reclaimed lands be surveyed without survey authority?
No, prior survey order or authority is required.
43What sections govern reclaimed land boundary surveys?
Sections 115 to 128 of DMC 2010-13.
44Can submerged portions be included in the land area of reclaimed lots?
No, submerged portions must be excluded.
45Can lot corners be established within submerged reclamation areas?
No.
46What must happen before reclaimed land is subdivided into smaller lots?
Its boundary survey must first be verified and approved.
47What is the minimum buffer zone along reclaimed land?
Twenty meters between the waterline and the sub-lots.
48How are foreshore land boundaries determined?
Using the average highest and lowest sea-water levels based on NAMRIA's published tide table.
49What happens when foreshore land adjoins an approved cadastral lot?
Its landward boundary must conform to the cadastral boundary.
50Which DMC sections govern foreshore land surveys?
Sections 115 to 128 of DMC 2010-13.
51Which section governs foreshore monuments and sketches?
Section 84 of DMC 2010-13.
52With whom should Geodetic Engineers coordinate regarding foreshore access roads?
The RTD for Lands and other concerned agencies.
53Under what section are amendment surveys of approved surveys conducted?
Section 134 of DMC 2010-13.
54What is the first requirement for an Amendment Survey?
Sepia copy of the approved survey plan and narrative technical description issued to the owner.
55What certification is required for an Amendment Survey?
Certification from LRA, RTC, or CENRO that the property is unregistered and not under land registration proceedings.
56What written document must the claimant submit for an Amendment Survey?
Explanation of the reason for requesting the amendment.
57What authorization is required if the applicant is not the owner or claimant?
Notarized written authorization or Special Power of Attorney from the owner.
58Is the original survey number retained after an amendment?
Yes, with suffixes such as Amd., Amd-2, and Amd-3.
59What regulation governs the conduct of Amendment Surveys?
Sections 115 to 128 of DMC 2010-13.
60What law governs Private Land Surveys?
Presidential Decree No. 1529, or the Property Registration Decree.
61What are the four classifications of Private Land Surveys?
Original, Subdivision, Consolidation, and Subdivision-Consolidation Surveys.
62What is an Original Survey of private land?
Survey of decreed or patented properties for original registration.
63What is a Subdivision Survey of private land?
Survey dividing decreed, patented, or titled properties into smaller lots.
64What is a Consolidation Survey?
Survey combining decreed, patented, or titled properties.
65What is a Subdivision-Consolidation Survey?
Survey combining and subdividing decreed, patented, or titled properties.
66Who may authorize a Private Land Survey?
The owner, legal claimant, authorized representative, or court.
67What must accompany private land survey returns as proof of ownership?
Documents establishing ownership, title, or the basis of the private ownership claim.
68What authorization is required for encumbered land?
Written authorization from the person or entity in whose favor the encumbrance was executed.
69What authorization is required when land is under court litigation?
Written authorization from the concerned court.
70How long is the Register of Deeds certification of a title valid?
Three months before submission of survey returns.
71What is a complex subdivision survey?
Subdivision of registered land pursuant to BP 220 and PD 957, as amended.
72What must be followed during a complex subdivision survey?
The approved subdivision scheme.
73Where must the approved subdivision scheme be submitted?
As part of survey returns to the concerned DENR-LMS for verification and approval.
74How should block boundary corners be marked?
With permanent concrete monuments.
75How may block and individual lot corners be temporarily marked?
With stakes or iron rods.
76When should temporary lot markers be replaced?
After land filling or grading is completed.
77What is required for subsequent subdivision or consolidation of an approved housing subdivision?
Approved alteration permit and scheme from the concerned LGU.
78When is an alteration permit not required?
When titled property has already been transferred to the buyer.
79When may a simple subdivision plan be prepared without full field notes?
When two intact old corners are connected by a straight line and boundaries are clearly defined by walls, shrubs, or other markers.
80What must accompany a simple subdivision plan submitted without field notes?
Landowner's conformity and notarized field notes cover.
81What additional requirements apply to subdivisions with ten or more resultant lots?
When the last subdivision was approved within six months, additional documents are required.
82What affidavit is required for qualifying subdivisions of ten or more lots?
Landowner's affidavit stating that the subdivision is not intended for housing subdivision projects.
83What certification may be required for qualifying subdivisions?
Community Mortgage Program certification, if applicable.
84What land-use document is required for qualifying subdivisions?
Land Use Certification from the concerned LGU.
85What report is required for qualifying subdivisions?
Investigation report and comments from LGU/HLURB.
86When is a connection survey not required in subdivision among co-owners?
When there is no PRS92 reference point within a one-kilometer radius.
87What survey system is used for Friar Land Surveys?
PRS92.
88What must Friar Land Surveys trace?
The original positions of lot corners.
89Which section governs Friar Land Survey procedures?
Section 137 of DMC 2010-13.
90What is required before conducting a Friar Land Survey?
Survey authority from the concerned DENR official.
91Which Friar Lands may receive Survey Authority?
Lands not covered by conveyance.
92What research must be conducted before a Friar Land Survey?
Research on the lot's status, technical description, and adjoining properties.
93What should be checked about adjoining Friar Land lots?
Whether previous surveys have already been transformed into PRS92.
94What reference point should be located for a Friar Land Survey?
The old reference point, if available and usable.
95What should be used if the old reference point cannot be used?
A newly established reference point within the vicinity.
96What may be conducted when no data are available from LMB and LMS?
A resurvey following Sections 115 to 128 of DMC 2010-13.
97How are National Government Land Surveys classified?
As isolated surveys.
98Which DAO sections govern National Government Land Surveys?
Sections 16 or 17 of DAO 2007-29.
99What are examples of National Government lands?
Forfeited lands, foreclosed lands, acquired properties, former fortifications, and other government-owned private properties.
100How can land become National Government property through taxation?
Through forfeiture for non-payment of taxes.
101How can land become National Government property through foreclosure?
Through adjudication to the government in foreclosure proceedings.
102What are cotas and baluartes?
Old structures formerly used as fortifications.
103What must a National Government Land Survey narrative report contain?
Land use and general condition of improvements.
104How are existing improvements shown on a National Government Land Survey plan?
Using dotted lines.
105What requirements apply when the government surveys private land for acquisition?
Requirements for Private Land Surveys or Section 136 of DMC 2010-13.
106How are Local Government Land Surveys classified?
As isolated surveys.
107Which DAO section governs Local Government Land Surveys?
Section 17 of DAO 2007-29.
108What resolution is required before surveying provincial land?
Provincial Board Resolution.
109What resolution is required before surveying city or municipal land?
Municipal or City Board Resolution.
110What procedures govern Local Government Land Surveys?
National Government Land Survey provisions or Section 140(b) of DMC 2010-13.
111Which sections govern Conversion Surveys?
Sections 115 to 128 of DMC 2010-13.
112What happens to Conversion Survey work after completion?
It undergoes verification and approval by the concerned LMS offices.
113What is a Political Boundary Survey?
Survey determining project coverage within a municipality or city and the exact location of lots.
114Why is a Political Boundary Survey conducted?
To obtain data needed for accurate technical descriptions.
115What are the three types of Political Boundary Surveys?
Provincial, Municipal/City, and Barangay Boundary Surveys.
116What must be considered in Provincial Boundary Surveys?
The existing legal boundaries of component cities and municipalities.
117What determines municipal or city boundaries?
The technical description in the law creating the municipality or city.
118What determines barangay boundaries?
The technical description in the law creating the barangay.
119When may legal boundary descriptions be reconsidered in the field?
When ambiguities in the creating law prevent determining boundaries on the ground.
120What is a Verification Survey?
Survey conducted to investigate errors, overlapping titled lands, or encroachment on another property.
121Who may order a Verification Survey?
The Regional Technical Director for Lands (RTD).
122What physical evidence must be examined during a Verification Survey?
Survey monuments, markers, buildings, fences, walls, and permanent improvements.
123Which evidence receives primary consideration in a Verification Survey?
Original survey marks.
124When may original survey marks be disregarded?
When evidence suggests they were incorrectly placed or disturbed.
125What must be determined regarding affected improvements?
The positions of buildings, fences, walls, and other permanent improvements affected by boundary determination.
126What must the Geodetic Engineer communicate to concerned parties?
The effects of the boundary determination.
127What document must be obtained from informed parties?
A statement confirming they were informed of the findings.
128What report must be submitted after a Verification Survey?
A narrative report under oath.
129What authority is required for a court-ordered Verification Survey?
Authority from the RTD for Lands specifying designated LMS officials or employees.
130Where should gross errors in adjoining surveys be recorded?
In the field notes.
131What is the responsibility of a Geodetic Engineer regarding survey discrepancies?
Disclose all doubts and discrepancies associated with the survey.
132What must an engineer do when their survey is reported erroneous?
Evaluate the area and survey thoroughly and report findings under oath.
133What must be submitted if the new survey has discrepancies?
Technical differences and an explanation of their causes.
134What happens if the Geodetic Engineer believes the original survey is correct?
The findings are reported to the RTD for Lands, who may order a joint survey.
135Who participates in a joint survey to resolve discrepancies?
The two Geodetic Engineers and a DENR-LMS Geodetic Engineer.
136Where are Verification Surveys reviewed and approved?
The concerned DENR-LMS Regional Office.
137What symbol identifies Verification Surveys?
Vs.
138How is the original survey number shown on a Verification Survey plan?
Immediately above the Vs survey symbol and number.
139What two main references are required reading for Lesson 4.1?
DAO 2007-29 and DMC 2010-13.
140What is the main learning outcome of Lesson 4.2?
Identify the requirements for approval of isolated surveys.
141What document contains the common requirements for isolated survey returns?
Section 178 of the DENR Manual for Land Surveys in the Philippines.
142What are the nine common requirements for isolated survey returns?
Transmittal letter, drafting film plan, PIS, field notes, notification letter, computations, astronomical observations, GE certificate, and instrument registration certificate.
143Who must sign and seal the letter of transmittal?
The Geodetic Engineer.
144What must the letter of transmittal contain?
An enumeration of documents submitted as survey returns.
145What is the required survey plan material?
Original drafting film plan.
146Who signs and seals the original drafting film plan?
The Geodetic Engineer.
147What does PIS stand for?
Parcel Information Sheet.
148For which lands is the PIS required?
Alienable and Disposable lands of the public domain.
149Which surveys require a PIS?
Cadastral, PLS, GSS, and TSS.
150Does PIS apply to AP and titled properties?
No.
151What field notes are required in isolated survey returns?
Original field notes and a duly notarized field notes cover.
152What field notes are required for AP?
Only the field notes cover.
153Is a survey notification letter required for all isolated surveys?
No, it is not required for AP.
154Which surveys are exempt from lot data and traverse computations?
AP surveys.
155When is traverse computation submitted?
Whenever a traverse has been executed.
156Which surveys are exempt from astronomical observation computation?
AS, AP, and CVN.
157For which surveys is astronomical observation computation optional?
PSD, PCS, CSD, and CCS.
158What certificate is required for original surveys?
Duly notarized GE Certificate.
159What instrument document is required for isolated survey returns?
Certificate of Instrument Registration under Section 22 of DAO 2007-29.
160Which surveys are exempt from the instrument registration certificate requirement?
AP surveys.
161What does Section 179 require regarding duplicate survey documents?
Duplicates must always be stored and submitted in digital form.
162How must GPS observed data be stored?
In digital files following Section 166(c) of DMC 2010-13.
163Which section lists additional requirements for specific isolated surveys?
Annex XIV of DMC 2010-13.
164What format must isolated survey plans follow?
LMB-prescribed format.
165What additional authority is required for computerized survey plans?
Authority from the LMB.
166What must be submitted before regularly using computerized survey forms?
A sample printout for LMB evaluation.
167How should property boundaries appear on isolated survey plans?
Full black ink lines, heavier than adjoining property boundaries.
168How are permanent walls along boundaries represented?
Using conventional symbols.
169How are lines from lot corners to control stations represented?
Dotted red ink lines.
170How are adjoining property boundaries represented?
Dotted lines in black ink.
171What adjoining information must appear on survey plans?
Owners' names, improvements, roads, streams, and their widths.
172How are lot corners represented on isolated survey plans?
Small black circles measuring two millimeters in diameter.
173What information must accompany lot corners?
Their respective descriptions.
174What color is used for boundary bearings and distances?
Black ink.
175How is the tie line of Corner 1 represented?
Thin black line with bearing and distance from the reference control point.
176What coordinate lines must pass through Corner 1?
Horizontal latitude and vertical longitude lines.
177What coordinate systems must be indicated on the plan?
Geographic and Cartesian grid coordinates in PPCS-TM/PRS92.
178What is the required color for plane-coordinate center lines divisible by five?
Red ink.
179Where is the latitude line drawn on the survey plan?
Horizontally from left to right through Corner 1.
180Where is the northing written on the latitude line?
Above the line.
181Where is the geographic latitude written?
Below the northing.
182Where is the longitude line drawn on the survey plan?
Vertically from top to bottom through Corner 1.
183Where is the easting written on the longitude line?
On its left side.
184Where is the geographic longitude written?
Opposite the easting on the other side.
185From which reference is northing and easting based?
BLLM No. 1.
186What determines the scale used for isolated survey plans?
The greater of the north-south or east-west coordinate differences.
187Which annex provides isolated survey plotting scales?
Annex XXIV of DMC 2010-13.
188How far must extreme lot corners be from each plan margin?
At least four centimeters.
189What scale rule applies when maximum coordinate difference exceeds 3,000 meters?
Use exact multiples of 1:4,000.
190What are examples of scales for large coordinate differences?
1:12,000 and 1:16,000.
191When should a property be plotted on multiple sheets?
When the property lines become generally shorter than half a centimeter at the required scale.
192How should a large parcel plotted on multiple sheets be divided?
Into convenient portions, each centered on its sheet.
193How should numerous small subdivision lots be plotted?
On two or more sheets using a uniform scale.
194What must be indicated when subdivisions are plotted on multiple sheets?
The sheet numbers containing the other portions.
195How may long, narrow tracts be plotted?
By dividing them into sections and plotting them on multiple plans.
196How many plans are required for each isolated parcel, tract, or lot?
One plan at the scale prescribed by Annex XXIV.
197When should bearings and distances be tabulated?
When they are too numerous to be clearly shown along boundary lines.
198What is required when a survey plan contains more than 50 lots?
Lot descriptions using LMB-authorized forms.
199Where is boundary data placed in subdivision-consolidation surveys?
In a boxed portion at the upper-left corner.
200What information should be placed in the Notes section?
Only information that cannot be inscribed directly on the plan.
201Which annex guides the preparation of survey plan Notes?
Annex XXV of DMC 2010-13.
202Which annex provides illustrations for isolated survey plans?
Annex XXVI of DMC 2010-13.
203What lettering style is required for survey plans?
Simple, uniform, mechanical, and non-ornamental lettering.
204What vegetation information is required for lots of at least one hectare?
Cultivated area boundaries and vegetation type.
205What terrain information is required for lots of at least one hectare?
Brief description of topography.
206What are examples of terrain classifications?
Plain, rolling, hilly, and mountainous.
207How are vegetation and terrain boundaries represented?
Light black dotted lines.
208What information is required for lots below one hectare?
General land classification, such as residential, rice, or commercial lot.
209How are permanent structures represented on survey plans?
Dotted black lines.
210What are examples of permanent structures shown on plans?
Buildings with concrete foundations and stone walls.
211What are the common requirements for Political Boundary Survey Returns?
Certifications and legal documents, technical references, field notes, computations, and political boundary maps.
212When is a project contract unnecessary for a Political Boundary Survey?
When the project is funded by the concerned LGU.
213What document replaces the project contract for an LGU-funded project?
Sangguniang Bayan Resolution.
214What certifications are required for Political Boundary Surveys?
Barangay Chairmen and Municipal Mayor certifications based on boundary agreements and adjoining municipalities' conformity.
215What law-related document is required for Political Boundary Survey Returns?
Copy of the law creating the municipality and its component barangays, if any.
216Which section governs duplicate copies of Political Boundary Survey Returns?
Section 167 of DMC 2010-13.
217Which section governs digital storage of GPS data for Political Boundary Surveys?
Section 166(c) of DMC 2010-13.
218What governs Mineral Land Survey Returns?
MGB requirements under DAO No. 96-40.
219What law is implemented by DAO No. 96-40?
Republic Act No. 7942, or the Philippine Mining Act of 1995.
220What are the requirements for Forestlands and Protected Areas Survey Returns?
Legal documents, technical references, and maps.
221What survey order is required for Forestlands and Protected Areas?
Survey Order.
222What report must CENRO provide?
Field Completion Report with inspection and photo documentation.
223Who issues the Certificate of Acceptability?
PENRO.
224What endorsement is required for Forestlands and Protected Areas Survey Returns?
Joint endorsement from RTDs for Forestry, Lands, and PAWCZMS.
225What GPS document is required for Forestlands and Protected Areas?
Duly notarized GPS Field Sheets.
226What reference-point document is required?
Approved Geographic Position of Reference Points.
227What position list is required?
Final List of Positions.
228What distance computation is required?
Grid Distance Computation.
229What monument document is required?
Monument Description Sheets.
230What recovery document is required?
Location Monument Recovery Report.
231What historical maps are required?
Old LC Maps covering the area.
232What technical descriptions must be included?
Descriptions from land titles, approved survey plans, and relevant legal documents.
233What are the four maps required for Forestlands and Protected Areas Survey Returns?
Preliminary LC Line Maps, Indicative Maps, Progress Maps, and FPABM.
234What does FPABM stand for?
Forestland and Protected Area Boundary Map.
235Who signs the FPABM?
The Chief of RCST.
236Which section governs duplicate documents for Forestlands and Protected Areas?
Section 167 of DMC 2010-13.
237Which section governs digital storage of GPS data for Forestlands and Protected Areas?
Section 166(c) of DMC 2010-13.
238What are the two main references for Lesson 4.2?
DAO 2007-29 and DMC 2010-13.
239What is the main purpose of submitting isolated survey returns?
To provide the required documents for survey verification and approval.